Natural
Resource Technology has retained Engineering
Partners to design a 2000 foot long sheet pile containment
wall at a Superfund site in Duluth, MN. Engineering Partners’
scope of services includes the evaluation of global stability
and development of a geotechnical instrumentation plan to
monitor performance. American Engineering Testing is acting
as a subconsultant to Engineering Partners.
Apache Stainless Steel
retained Engineering Partners to evaluate the structural capacity
of proposed overhead crane bays in an existing building and
to design improvements.
Veit Companies
has retained Engineering Partners to analyze and design a
temporary and permanent 30’ high foundation wall system
for the proposed Alumni Center at Iowa State University in
Ames, IA. The wall system will serve as a load carrying member
of the structure.
Engineering Partners worked with Carl
Bolander & Sons Company to develop a unique
sheet pile design, which served as the structural foundation
wall and earth retention system for the Flour Sack Flats Housing
development in Minneapolis, MN.
Ames Construction
retained Engineering Partners to design a jacking pit on the
Empire Phase II- Rosemount Interceptor project in Rosemount,
MN. A special design of the reaction frame was required to
avoid load stress distribution to an adjacent buried structure.
Carl Bolander & Sons Company
retained Engineering Partners to design helical pier foundations
for several structures at Holman Field in Minneapolis, MN.
Engineering Partners provided peer review services to Montgomery
Associates/Resource Solutions on the Sagamore
Development in Porter County, IN.
Veit Companies
has retained Engineering Partners to design a temporary retention
system to stabilize an existing 30’ high wall of the
original Guthrie Center Theater in Minneapolis, MN during
the demolition process.
Engineering and Construction
Innovations retained Engineering Partners
to design a pumping station for the Metropolitan Council Environmental
Services in Hugo, MN. The 20’ x 40’ pumping station
was designed as a caisson and sunk 20’ to the final
design elevation.
Previous
Updates
Veit
Companies retained Engineering Partners
for a design-build project as part of the Dallas County,
IA Courthouse renovations. Micro-piles carrying a 50k design
load were installed inside the existing building to support
new foundations.
Engineering Partners was retained by Kiewit
Construction to install vibrating wire extensometers
for the Michigan Street Tunnel in Grand Rapids, MI.
RJS Construction Group
selected Engineering Partners to perform anchor proof tests
as part of the ship channel repairs in the Duluth Harbor.
Cook Composites and Polymers (CCP) retained
Engineering Partners to perform a feasibility study and
prepare a preliminary budget for a new rail spur and chemical
unloading facility at their Chatham, VA plant.
EP Engineering Partners performed a value engineering study
for Engineering & Construction
Innovations to evaluate construction of
a wet well in Hugo, MN using caisson sinking methods.
Michels Pipeline Construction
has retained Engineering Partners to perform a precondition
survey and install geotechnical instrumentation for an interceptor
sewer tunnel in Appleton, WI.
Card Bolander & Sons Co.
engaged Engineering Partners to design a micro-pile foundation
system, as an alternative to drilled piers, at the Nassef
Heart Hospital in Minneapolis, MN.
Engineering Partners has been retained by the Village of
Lake Delton, WI and MSA Professional
Services to evaluate alternative earth retention
systems and prepare a final design for construction of a
30 foot deep pumping station.
---------------------------------
Engineering
Partners has formed an alliance with Speedway
Sand & Gravel, Middleton, WI to provide
design-build services for earth retention systems and underpinning
on local projects. As part of this initiative, Engineering
Partners is designing shoring systems for numerous excavations
on the Campus Utility Upgrade project on the UW-Madison
campus.
Ames Construction
has retained Engineering Partners to prepare a Work Plan
for consolidation grouting of tunnel sections on the Empire
Phase III/Rosemount Interceptor project in Rosemount, MN.
The firm will also oversee implementation of the grouting
program.
Veit Companies
has retained Engineering Partners to design a permanent
soil-nail earth retention system for a chilled water line
and shaft on the University of Iowa campus in Iowa City,
IA.
Engineering Partners has been contracted by Northland
Construction to design the false work and
shoring system for construction of the McQuade Road Bridge
in Duluth, MN.
Carl Bolander & Sons Co. has retained
Engineering Partners to evaluate subsurface conditions and
design the foundation system for the Bryant Hill development
near St. Paul, MN. The residential development will be constructed
over a former demolition waste area. Engineering Partners
is also working with Bolander
and Fru-Con Construction Corp.
to prepare a demolition plan for the Four Bears Bridge over
the Missouri River near New Town, ND.
Engineering Partners was contracted by RETEC
to design a temporary earth retention system to facilitate
excavation and remediation of a former coal gasification
site at the Xcel High Bridge power plant in St. Paul, MN.
Bogdan
Winiarczyk, P.E. has joined Engineering
Partners as a Senior Structural Engineer and Associate.
Bogdan has 30 years of engineering design and heavy construction
experience. His addition to the firm enhances its capabilities
in the analysis and design of underground, heavy industrial
and water retaining structures.
Engineering Partners has been selected by
S.M. Hentges & Sons Co. to perform precondition surveys
and install geotechnical instrumentation on the West Chaska
Interceptor Sewer project in Chaska, MN.
Carl Bolander & Sons Co. has completeld the demolition
of the 17 story Grand Hotel building in Bloomington, MN,
as part of the MAC runway safety expansion. Engineering
Partners prepared the demolition plan for
Bolander.
Engineering Partners provided Value Engineering
services to Sheehy Construction on the Rochester, MN WWTP
improvements. Sheehy also retained Engineering
Partners to perform precondition surveys
for two projects.
Agriliance has retained Engineering
Partners to analyze and redesign the anchorage
system for a barge unloading operation in the Mississippi
River, near downtown St. Paul, MN.
Engineering Partners has been selected by
Jay Dee-Kenny Joint Venture to perform a precondition survey
for the Cady Marsh Ditch Tunnel project in the Town of Griffith,
IN.
Wenck Associate has retained Engineering
Partners to design a new outfall structure
in Prior Lake, MN and the structural design for a new water
treatment plant in Delano, MN. Engineering
Partners also provided geotechnical services
for the Prior Lake project.
Engineering Partners provided geotechnical
services to Triad Engineering on the Superior Linens plant
expansion in Cudahy, WI.
|